★Manufacturing Business Segment

Type 25 passenger train: Vacuum toiletsystem, shaft end groundingdevice, calorifier, electrical control cabinet,etc..

High-speed EMU (CRH): supporting systemsfor speed grades of 200 km/hand 300 km/h: potable water system, grey watersystem, system, pipeline system,welded structural parts.

High-speed EMU (CR): supportingsystems for speed grades of 200 km/hand 300 km/h: potable water system, greywater system, system, pipeline system,welded structural parts.

 

★Urban rail transit projects

SATCO: Shanghai Metro Line 6/8train-body large-size component module.

CRRC ChangchunRailwayVehicles-Bombardier Joint Venture (CBRC): Welded structural parts.

Tianjin-Binhai Line: Shaft end groundingdevice.

Guangzhou-Foshan Metro Line: Shaft endgrounding device.

CRRC Nanjing Puzhen Co., Ltd.:Large-size components of Wuxi Metro.

 

★"Belt and Road" BusinessSegment

ThailandRailway Project: Vacuumsanitation system for160KM Luxury Passenger Trains.

MalaysiaNational EMU: Vacuum sanitationsystem for 200KMEMU.

MacedoniaNational EMU: EMU sanitationsystem, China's first EMU project exported to Europe.